Vertical drop

From FIS Freestyle wiki

(Difference between revisions)
Jump to: navigation, search
Revision as of 07:54, 13 August 2008 (edit)
Joe (Talk | contribs)

← Previous diff
Current revision (13:29, 27 November 2018) (edit) (undo)
Joe (Talk | contribs)
('''Slope Steepness''')
 
(19 intermediate revisions not shown.)
Line 1: Line 1:
-the total difference expressed in meters from [[the start]] elevation to [[the finish]] elevation+'''[[Vertical drop]]''' the total difference expressed in meters from '''[[the start]]''' '''[[elevation]]''' to '''[[the finish]]''' '''[[elevation]]'''.
 + 
 +== '''Slope Steepness''' ==
 +[[Image:Grades degrees.png|There are two ways of measuring slope steepness. The first is a measurement using '''[[degrees]]''', which measures the angle of the slope in degrees from the horizontal. The second is a percentage.|thumb|200px]]
 +There are two ways of measuring slope steepness. The first is a measurement using '''[[degrees]]''', which measures the angle of the slope in degrees from the horizontal. The second is a percentage.
 + 
 +This is calculated using the formula 100*rise/run. Rise is the vertical change and run is the horizontal distance. A 100% slope is angled at 45 degrees.
 + 
 +*10% is equivalent to 5.71º
 +*20% is equivalent to 11.31º
 +*30% is equivalent to 16.7º
 +*40% is equivalent to 21.8º
 +*50% is equivalent to 25.67º
 +*75% is equivalent to 36.8º
 +*100% is equivalent to 45º
 + 
 +A beginner slope is typically between 6% and 25%. Intermediate hills range from 25% to 40%, and expert is 40% plus.
 + 
 +== '''Also See''' ==
 +*'''[[Contour line]]'''
 +*'''[[latitude]]'''
 +*'''[[longitude]]'''
 +*'''[[Global Positioning System]]'''
 +* '''[[Zenith]]'''
 +*'''[[time]]'''
 +*'''[[Codex]]'''
 +*'''[[Year]]'''
 +*'''[[Date]]'''
 +*'''[[Season]]'''
 +*'''[[Freestyle Course Layout]]'''
 +*'''[[Maximum Grade]]'''
 +*'''[[Application for Freestyle Course Homologation]]'''
 +*'''[[Freestyle Course Homologation Program]]'''
 + 
 +----
 +Return to '''[[Ski Cross Glossary]], [[Freestyle Skiing]]''' or '''[[Freestyle Course Layout]]'''
 + 
 +[[Category:Freestyle Skiing]][[Category:Freestyle Glossary]] [[Category:Freestyle Skiing Statistics]]
 +[[Category:Freestyle Course Preparation]]

Current revision

Vertical drop the total difference expressed in meters from the start elevation to the finish elevation.

[edit] Slope Steepness

There are two ways of measuring slope steepness. The first is a measurement using degrees, which measures the angle of the slope in degrees from the horizontal. The second is a percentage.
There are two ways of measuring slope steepness. The first is a measurement using degrees, which measures the angle of the slope in degrees from the horizontal. The second is a percentage.

There are two ways of measuring slope steepness. The first is a measurement using degrees, which measures the angle of the slope in degrees from the horizontal. The second is a percentage.

This is calculated using the formula 100*rise/run. Rise is the vertical change and run is the horizontal distance. A 100% slope is angled at 45 degrees.

  • 10% is equivalent to 5.71º
  • 20% is equivalent to 11.31º
  • 30% is equivalent to 16.7º
  • 40% is equivalent to 21.8º
  • 50% is equivalent to 25.67º
  • 75% is equivalent to 36.8º
  • 100% is equivalent to 45º

A beginner slope is typically between 6% and 25%. Intermediate hills range from 25% to 40%, and expert is 40% plus.

[edit] Also See


Return to Ski Cross Glossary, Freestyle Skiing or Freestyle Course Layout

Personal tools