Ski Cross World Cup Inspection Report

From Fiswiki

(Difference between revisions)
Jump to: navigation, search
Revision as of 20:38, 27 November 2011 (edit)
Joe (Talk | contribs)
('''Equipment Gallery''')
← Previous diff
Current revision (20:39, 27 November 2011) (edit) (undo)
Joe (Talk | contribs)
('''Equipment Gallery''')
 
Line 237: Line 237:
Image:Portable toilet.jpg|A '''[[portable toilet]]''' is a modern, portable, self-contained outhouse manufactured of molded plastic in a variety of colors and is often used as a temporary toilet for construction sites and large gatherings and events. Image:Portable toilet.jpg|A '''[[portable toilet]]''' is a modern, portable, self-contained outhouse manufactured of molded plastic in a variety of colors and is often used as a temporary toilet for construction sites and large gatherings and events.
Image:Outdoor speaker system.jpg|'''[[Public address system]]''' (PA system) is an electronic amplification system with a '''[[mixer]]''', '''[[amplifier]]''' and '''[[loudspeakers]]''', used to reinforce a sound source, e.g., a person giving a speech, a '''[[DJ]]''' playing prerecorded music, and distributing the sound throughout a '''[[venue]]''' or building. Image:Outdoor speaker system.jpg|'''[[Public address system]]''' (PA system) is an electronic amplification system with a '''[[mixer]]''', '''[[amplifier]]''' and '''[[loudspeakers]]''', used to reinforce a sound source, e.g., a person giving a speech, a '''[[DJ]]''' playing prerecorded music, and distributing the sound throughout a '''[[venue]]''' or building.
-Image:2 way radio system.jpg|thumb|300px|'''[[Radio]]''' is the transmission of signals by modulation of electromagnetic waves with frequencies below those of visible light. This can be detected and transformed into sound or other signals that carry information.+Image:2 way radio system.jpg|'''[[Radio]]''' is the transmission of signals by modulation of electromagnetic waves with frequencies below those of visible light. This can be detected and transformed into sound or other signals that carry information.
Image:Snowmobile.jpg|'''[[Snowmobile]]''' is a land vehicle for winter travel on '''[[snow]]'''. Designed to be operated on snow and '''[[ice]]''', they require no road or trail. Design variations enable some machines to operate in deep snow or forests; most are used on open terrain, including frozen lakes, or driven on paths or trails. Usually built to accommodate a driver and perhaps one adult passenger, their use is much like motorcycles and all-terrain vehicles (ATVs) intended for winter use. Image:Snowmobile.jpg|'''[[Snowmobile]]''' is a land vehicle for winter travel on '''[[snow]]'''. Designed to be operated on snow and '''[[ice]]''', they require no road or trail. Design variations enable some machines to operate in deep snow or forests; most are used on open terrain, including frozen lakes, or driven on paths or trails. Usually built to accommodate a driver and perhaps one adult passenger, their use is much like motorcycles and all-terrain vehicles (ATVs) intended for winter use.
Image:Ski cross control gate.jpg|A triangular panel held in place by short pole (stubies) on the short side and longer pole on the other side. Image:Ski cross control gate.jpg|A triangular panel held in place by short pole (stubies) on the short side and longer pole on the other side.

Current revision

Contents

[edit] The Competition Committee

See The Competition Committee or ICR 3020


[edit] The Ski Cross Competition Slope, Track and Features

  • The Organizer is also required to provide a detail drawing of the course see Ski Cross Course Drawings for some different examples.
  • Ski Cross Details is a list of the basic information about the course. This information needs to be collected and filled out by the Organizers.

[edit] Medical Support Requirements

  • See the FIS Medical Guide containing Medical Rules and Guidelines download here: [1]

[edit] Ski Cross Course Preparation

Staff Material # Of Persons
2 snow-cats for around 3-5 days / 2 snowcat driver – not on regular snowcat shift
Shapers for course building with shovels/ 6-8
Course Designer / Builder / During building and competition period 1

[edit] Official Training Days

Staff Material # Of Persons
1-2 snow-cats to prepare landings, etc. 1-2 snow-cat drivers – not on regular shift
Starter 1
Assistant Starter 1
Chief of Competition (in Jury) 1
Section Chiefs 6-8 as required by the course layout
Section Helpers 1 extra person w shovel; drill, gate key / 6-8 as required by the course layout
Course Maintenance 3 groups with 2 persons on skis only 6
Slippers experienced skiers minimum with rakes/shovels 10
Color Crew with skis only (pump with blue color) 3
Security – Crowd Control each side of the finish area 2
Exit-Gate Control 1
Event Medical Director at start–either ski or Snowmobile 2
Ski Patrol two groups 2 persons + 2 sledge 4 or as required by the course layout EAP
Fence and Safety Control - Ski Cross as required by the course layout

[edit] Competition Day

Staff Material # Of Persons
1-2 snow-cats to prepare landings, etc. 1-2 snow-cat drivers – not on regular shift
Chief of Start 1
Starter 1
Assistant Starter 1
Chief of Competition (in Jury) 1
Referee (in Jury) 1
Finish Line Judges (Final) with clipboard, paper and pencil 3
Section Chiefs 6-8 as required by the course layout
Section Helpers 1 extra person w shovel; drill, pole key / 6-8 as required by the course layout
Course Maintenance 3 groups with 2 persons on skis only 6
Slippers experienced skiers minimum with rakes / shovels 10
Color Crew with skis only (Sprayer with blue color) 3
Security – Crowd Control each side of the finish area 2
Exit-Gate Control 1
Event Medical Director at start –either ski or Snowmobile 2
First Response two groups 2 persons + 2 sledge 4 or as required by the course layout EAP
Building Crew to help building TV-platforms, etc. 4-6
Course Maintenance 3 groups with 2 persons on skis only 6
Accreditation Control around the finish area – depending zones 4-6
Score/Results Board – At Start to write down times/ranks– 2 radios OC
Score/Results BoardFinish Area to write down times/ranks– 1 radio OC
Doping Control (if required) 12 6 women and 6 men (chaperones)
Fence and Safety Control - Ski Cross as required by the course layout

[edit] Equipment Requirements

  • Fencing: 1 m crowd control fence on both sides of the course to separate the course from the general public.
  • B-net on all banks (around 400-600 meters – depending on course length and amount of banks).
  • Starting Gate As per attached or FIS approved other device. Each start position has a lane number from left to right looking up) lane 1 is far left and lane 4 is far right
  • Color Blue for coloring features (minimum 4 pumps) Red color only for finish line.
  • Official Notice Board and Scoreboard A suitable board in the finish area (marked as “OFFICIAL NOTICE BOARD" - close to the exit gate (minimum 2 x 2 meters) to post results, heat sheets, jury decisions, etc. and to write down times/rank during Qualification and Finals. A suitable board in the start area (minimum 1 x 2 meters) to post official results, jury decisions, information and to write down scores during Qualifications and Finals.
  • Start Tent Available for competitors - minimum 5 x 5 meters, closed, secured and heated - (restaurant within 100m is adequate)
  • Drinking Water Hot tea and cold water (without gas) during training and competition for competitors.
  • Toilets 1 toilet located close (100m) to start area (portable toilets).
  • Sound System Specifications as per sound company and local situation – during competition not to loud that we can run the event. For training minimum music is required.
  • Speakers English is required and respective national language – the best is two speakers (also for training, qualifications and awards).
  • DJ Very important – musical selection depends on the audience and local habits.
  • Radios 14 radios to run the competition (these are only for the sport not for security, concerts, etc.). OC needs extra radios for internal communication.
  • Snowmobile A minimum of five Snowmobile’s (with drivers) are necessary for the finals in SX or a suitable lift just beside the SX-course.
  • Poles / Long poles: Minimum of 40 red and 40 blue fixed plastic poles and minimum of 20 red and 20 blue flex plastic poles and a minimum of 4 gate keys from the OC
  • Timing Cabin A heated lockable building / container with power (separate electric circuit) and tables and chairs for 6 people (minimum 12 square meters) with windows, located adjacent to the finish line is required at all venues. FIS Data Service (data processing company)will provide more details.
  • Awards Stage A stage (5x4 meter) beside the finish area (where TV cameras have easy access) with a table for the prizes. Before a corridor with 1 meter crowd control metal fence for press / TV / photographers...


[edit] Equipment Gallery

[edit] Power Requirements

needed at:

[edit] Also see;