Race Construction
From FIS Freestyle wiki
(Difference between revisions)
Revision as of 10:03, 3 March 2010 (edit) Ojanen (Talk | contribs) ← Previous diff |
Current revision (11:20, 3 March 2010) (edit) (undo) Ojanen (Talk | contribs) |
||
(10 intermediate revisions not shown.) | |||
Line 1: | Line 1: | ||
Race construction elements | Race construction elements | ||
---- | ---- | ||
- | |||
The following are considered as “race construction elements” | The following are considered as “race construction elements” | ||
Line 9: | Line 8: | ||
Interview wall /Award Backdrop (IW) | Interview wall /Award Backdrop (IW) | ||
Blowers (4 for Start Construction, 1 for Exit Gate, 1 for Interview wall/Award Backdrop) | Blowers (4 for Start Construction, 1 for Exit Gate, 1 for Interview wall/Award Backdrop) | ||
- | |||
Branding materials | Branding materials | ||
---- | ---- | ||
- | |||
The following are considered as “branding materials” | The following are considered as “branding materials” | ||
Gate flags (50% with ” Sponsor” only) | Gate flags (50% with ” Sponsor” only) | ||
Line 20: | Line 17: | ||
- | Advertising space | ||
- | ---- | ||
- | The TOUR logo will be displayed on the official “start structure”. In addition: | ||
- | - 50% of the global advertising area will be attributed to the Sponsor logo | ||
- | - 50% will be attributed to the local sponsor and the hosting ski area or tourism region | ||
- | + | Banners and Beachflags | |
- | + | ||
- | + | ||
+ | The size of each advertising banner shall be 1m high x 4m wide(frames supplied by Agent) | ||
+ | |||
+ | Number and position of sponsor banners Banners | ||
+ | Ten (10) Sponsor banners or Sponsor Product banners will be placed on course in “A” | ||
+ | locations (top locations) which are visible for TV and photo coverage as follows: | ||
+ | 2 at the start | ||
+ | 6 along the course e.g. On jumps or features | ||
+ | 2 in the finishing area next to the exit gates | ||
+ | One Sponsor banner will be displayed on each of the following: | ||
+ | official function building / structures | ||
+ | timing building / tent | ||
+ | |||
+ | The size of each advertising beach flag shall be 1.2m wide and 5.4m high | ||
+ | (masts supplied by Agent) | ||
+ | Number and position of Sponsor Beachflags | ||
+ | Eight Sponsor beach flags will be placed on course in “A locations” | ||
+ | (top locations) which are visible for TV and photo coverage as follows: | ||
+ | 2 at the start | ||
+ | 4 on course | ||
+ | 2 in the finishing zone | ||
+ | |||
+ | ---- | ||
[[FIS Freestyle World Cup Sponsor guide]] | [[FIS Freestyle World Cup Sponsor guide]] | ||
- | [[Category:Freestyle Skiing]] | + | [[Category:Freestyle Skiing]] [[Category:FIS Freestyle World Cup]] |
Current revision
Race construction elements
The following are considered as “race construction elements”
Start Structure (SS) Exit gate (EG) Finish columns (FC) Interview wall /Award Backdrop (IW) Blowers (4 for Start Construction, 1 for Exit Gate, 1 for Interview wall/Award Backdrop)
Branding materials
The following are considered as “branding materials”
Gate flags (50% with ” Sponsor” only) Course banners (1m x 4m) and Beachflags Logo Velcro patches and logo plates
Banners and Beachflags
The size of each advertising banner shall be 1m high x 4m wide(frames supplied by Agent)
Number and position of sponsor banners Banners Ten (10) Sponsor banners or Sponsor Product banners will be placed on course in “A” locations (top locations) which are visible for TV and photo coverage as follows: 2 at the start 6 along the course e.g. On jumps or features 2 in the finishing area next to the exit gates One Sponsor banner will be displayed on each of the following: official function building / structures timing building / tent
The size of each advertising beach flag shall be 1.2m wide and 5.4m high (masts supplied by Agent) Number and position of Sponsor Beachflags Eight Sponsor beach flags will be placed on course in “A locations” (top locations) which are visible for TV and photo coverage as follows: 2 at the start 4 on course 2 in the finishing zone