Race Construction

From Fiswiki

(Difference between revisions)
Jump to: navigation, search
Revision as of 09:57, 3 March 2010 (edit)
Ojanen (Talk | contribs)
(New page: == Race Construction == The following are considered as “race construction elements” 􀂃 Start Structure (SS) 􀂃 Exit gate (EG) 􀂃 Finish columns (FC) 􀂃 Interview wall /Award...)
← Previous diff
Revision as of 09:58, 3 March 2010 (edit) (undo)
Ojanen (Talk | contribs)

Next diff →
Line 3: Line 3:
The following are considered as “race construction elements” The following are considered as “race construction elements”
-􀂃 Start Structure (SS)+ Start Structure (SS)
-􀂃 Exit gate (EG)+ Exit gate (EG)
-􀂃 Finish columns (FC)+ Finish columns (FC)
-􀂃 Interview wall /Award Backdrop (IW)+ Interview wall /Award Backdrop (IW)
-􀂃 Blowers (4 for Start Construction, 1 for Exit Gate, 1 for Interview wall/Award Backdrop)+ Blowers (4 for Start Construction, 1 for Exit Gate, 1 for Interview wall/Award Backdrop)
 + 
 +The following are considered as “branding materials”
 + Gate flags (50% with ” Sponsor” only)
 + Course banners (1m x 4m) and Beachflags
 + Logo Velcro patches and logo plates

Revision as of 09:58, 3 March 2010

Race Construction

The following are considered as “race construction elements”

 Start Structure (SS)
 Exit gate (EG)
 Finish columns (FC)
 Interview wall /Award Backdrop (IW)
 Blowers (4 for Start Construction, 1 for Exit Gate, 1 for Interview wall/Award Backdrop)

The following are considered as “branding materials”

 Gate flags (50% with ” Sponsor” only)
 Course banners (1m x 4m) and Beachflags
 Logo Velcro patches and logo plates